ITAC Assessment: SU0143
ITAC logo
ITAC Assessment: SU0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product envelope Printing
NAICS
n/a
SIC 2677: Envelopes
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 56,000
ft2
Annual Production 25,373,350
pieces
Production Hrs. Annual 6,205
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,904 594,500
kWh
Other Energy $44,874 2,738
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,497 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,409

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1392: Replace purchased steam with other energy source $29,798 $32,697 - - $29,798
-
MMBtu
- -
02 4.441: Install automatic packing equipment $4,584 $10,455 - - - $715 $3,869
03 2.7447: Install vinyl strip / high speed / air curtain doors $4,371 $3,000 - - $4,371
-
MMBtu
- -
04 2.7111: Reduce illumination to minimum necessary levels $3,432 $300 $3,432
38,130
kWh
- - - -
05 2.7111: Reduce illumination to minimum necessary levels $1,656 $420 $1,656
18,396
kWh
- - - -
06 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $42,656 $128,836 $49,904
594,500
kWh
$(-52,122.0)
-
MMBtu
$44,874
-
MMBtu
- -
TOTAL RECOMMENDED $86,497 $175,708 $54,992
651,026
kWh
$(-52,122.0)
-
MMBtu
$79,043
-
MMBtu
$715 $3,869
TOTAL IMPLEMENTED $40,409 $46,572 $1,656
18,396
kWh
- $34,169
-
MMBtu
$715 $3,869
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs