| Assessment Year | 2002 |
|---|---|
| Principal Product | envelope Printing |
| NAICS |
n/a
|
| SIC | 2677: Envelopes |
| Sales Range | $5 M to 10M |
| # of Employees | 100 |
| Plant Area |
56,000
ft2
|
| Annual Production | 25,373,350
pieces
|
| Production Hrs. Annual | 6,205
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $49,904 | 594,500 |
kWh
|
$0.084 |
| Other Energy | $44,874 | 2,738 |
MMBtu
|
$16.39 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $86,497 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $40,409 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1392: Replace purchased steam with other energy source | $29,798 | $32,697 | - | - |
$29,798
-
MMBtu
|
- | - | |
| 02 | 4.441: Install automatic packing equipment | $4,584 | $10,455 | - | - | - | $715 | $3,869 | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,371 | $3,000 | - | - |
$4,371
-
MMBtu
|
- | - | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $3,432 | $300 |
$3,432
38,130
kWh
|
- | - | - | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $1,656 | $420 |
$1,656
18,396
kWh
|
- | - | - | - | |
| 06 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $42,656 | $128,836 |
$49,904
594,500
kWh
|
$(-52,122.0)
-
MMBtu
|
$44,874
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $86,497 | $175,708 |
$54,992
651,026
kWh
|
$(-52,122.0)
-
MMBtu
|
$79,043
-
MMBtu
|
$715 | $3,869 | ||
| TOTAL IMPLEMENTED | $40,409 | $46,572 |
$1,656
18,396
kWh
|
- |
$34,169
-
MMBtu
|
$715 | $3,869 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs