IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product WIRE SHELVES FOR APPLIANCES
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $5
M
to 10
M
# of Employees 89
Plant Area
n/a
Annual Production 3,500,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,047 2,684,056
kWh
Natural Gas $181,324 39,921
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,509 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,885 $200 $2,885
9,965
kWh
-
02 2.7494: Install storm windows and doors $4,277 $8,800 - $4,277
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,757 $250 - $3,757
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,590 $1,300 $3,283
47,479
kWh
$(-693.0)
-
MMBtu
TOTAL RECOMMENDED $13,509 $10,550 $6,168
57,444
kWh
$7,341
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs