ITAC Assessment: KU0115
ITAC logo
ITAC Assessment: KU0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product MOBILE HOMES
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 1,000
pieces
Production Hrs. Annual 2,493
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,029 359,027
kWh
Natural Gas $23,742 4,418
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,828 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,437

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,417 $100 $5,417
64,771
kWh
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $2,391 $965 - $2,391
-
MMBtu
-
03 2.7111: Reduce illumination to minimum necessary levels $1,447 $1,181 $1,447
17,292
kWh
- -
04 2.7444: Close holes and openings in building such as broken windows $398 $100 - $698
-
MMBtu
$(-300.0)
05 2.1123: Install automatic stack damper $175 $2,500 - $175
-
MMBtu
-
TOTAL RECOMMENDED $9,828 $4,846 $6,864
82,063
kWh
$3,264
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $7,437 $3,881 $6,864
82,063
kWh
$873
-
MMBtu
$(-300.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs