| Assessment Year | 2002 |
|---|---|
| Principal Product | furniture |
| NAICS |
n/a
|
| SIC | 2511: Wood Household Furniture, Except Upholstered |
| Sales Range | $50 M to 100M |
| # of Employees | 950 |
| Plant Area |
370,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,845
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $467,108 | 9,145,052 |
kWh
|
$0.051 |
| Electricity Fees | $200,568 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $362,801 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $46,560 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Wood Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $301,334 | $2,109,900 |
$667,588
9,060,527
kWh
|
$(-345,599.0) |
$14,890
-
MMBtu
|
- | $(-35,545.0) | - | |
| 02 | 3.5313: Increase amount of waste recovered for resale | $42,602 | $19,900 |
$(-6,170.0)
(-84,525)
kWh
|
- | - |
$34,788
-
lb
|
- | $13,984 | |
| 03 | 2.3212: Optimize plant power factor | $9,118 | $3,100 | - | $9,118 | - | - | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $3,958 | $230 |
$3,958
54,220
kWh
|
- | - | - | - | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,062 | - |
$3,062
41,957
kWh
|
- | - | - | - | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,095 | - |
$2,095
28,698
kWh
|
- | - | - | - | - | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $632 | $700 |
$632
8,667
kWh
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $362,801 | $2,133,830 |
$671,165
9,109,544
kWh
|
$(-336,481.0) |
$14,890
-
MMBtu
|
$34,788
-
lb
|
$(-35,545.0) | $13,984 | ||
| TOTAL IMPLEMENTED | $46,560 | $20,130 |
$(-2,212.0)
(-30,305)
kWh
|
- | - |
$34,788
-
lb
|
- | $13,984 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Wood Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs