Assessment Year | 2005 |
---|---|
Principal Product | Corrugated fiberboard |
NAICS | 326191: Plastics Plumbing Fixture Manufacturing |
SIC | 3088: Plastics Plumbing Fixtures |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
213,000
ft2
|
Annual Production | 60,000
ton
|
Production Hrs. Annual | 6,732
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $698,705 | 8,334,974 |
kWh
|
$0.084 |
Electricity Demand | $116,367 | 11,218 |
kW-mo/yr
|
$10.37 |
Natural Gas | $305,179 | 49,676 |
MMBtu
|
$6.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,007 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,876 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $7,131 | $15,000 | - | - |
$7,131
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,570 | $280 |
$2,925
34,905
kWh
|
$645
-
kW-mo/yr
|
- | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $1,916 | $144 |
$1,916
22,863
kWh
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $390 | $170 |
$390
4,653
kWh
|
- | - | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $42,000 | $18,500 | - | - | - |
$42,000
-
lb
|
|
TOTAL RECOMMENDED | $55,007 | $34,094 |
$5,231
62,421
kWh
|
$645
-
kW-mo/yr
|
$7,131
-
MMBtu
|
$42,000
-
lb
|
||
TOTAL IMPLEMENTED | $5,876 | $594 |
$5,231
62,421
kWh
|
$645
-
kW-mo/yr
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs