ITAC Assessment: SD0361
ITAC logo
ITAC Assessment: SD0361
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Corrugated fiberboard
NAICS 326191: Plastics Plumbing Fixture Manufacturing
SIC 3088: Plastics Plumbing Fixtures
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 213,000
ft2
Annual Production 60,000
ton
Production Hrs. Annual 6,732
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $698,705 8,334,974
kWh
Electricity Demand $116,367 11,218
kW-mo/yr
Natural Gas $305,179 49,676
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.2414: Use waste heat from hot flue gases to preheat $7,131 $15,000 - - $7,131
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,570 $280 $2,925
34,905
kWh
$645
-
kW-mo/yr
- -
03 2.6231: Utilize controls to operate equipment only when needed $1,916 $144 $1,916
22,863
kWh
- - -
04 2.7135: Install occupancy sensors $390 $170 $390
4,653
kWh
- - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $42,000 $18,500 - - - $42,000
-
lb
TOTAL RECOMMENDED $55,007 $34,094 $5,231
62,421
kWh
$645
-
kW-mo/yr
$7,131
-
MMBtu
$42,000
-
lb
TOTAL IMPLEMENTED $5,876 $594 $5,231
62,421
kWh
$645
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs