ITAC Assessment: SU0139
ITAC logo
ITAC Assessment: SU0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product bowling pins and lanes
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 106,441
ft2
Annual Production 140,000
pieces
Production Hrs. Annual 3,920
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $339,268 5,871,307
kWh
Electricity Demand $218,363 15,348
kW-mo/yr
Electricity Fees $129 -
Natural Gas $152,280 27,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $668,023 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,809

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Wood Savings Other Liquid (haz) Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $602,817 $2,180,000 $555,092
5,870,307
kWh
- - $72,725
-
MMBtu
$(-25,000.0)
-
MMBtu
-
02 3.5311: Recover and reuse waste material $22,050 $8,000 - - - - - $22,050
-
gal
03 2.2437: Recover waste heat from equipment $10,623 $2,160 - - - $5,098
-
MMBtu
$5,525
-
MMBtu
-
04 2.6218: Turn off equipment when not in use $8,410 - $6,110
98,071
kWh
- - $2,300
-
MMBtu
- -
05 2.4133: Use most efficient type of electric motors $7,261 $11,724 $3,164
51,035
kWh
$4,097
-
kW-mo/yr
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $5,799 - $5,799
93,084
kWh
- - - - -
07 2.3212: Optimize plant power factor $5,266 $16,600 - - $5,266 - - -
08 2.4221: Install compressor air intakes in coolest locations $4,186 $138 $4,186
67,198
kWh
- - - - -
09 2.7124: Make a practice of turning off lights when not needed $1,611 $570 $1,611
25,854
kWh
- - - - -
TOTAL RECOMMENDED $668,023 $2,219,192 $575,962
6,205,549
kWh
$4,097
-
kW-mo/yr
$5,266 $80,123
-
MMBtu
$(-19,475.0)
-
MMBtu
$22,050
-
gal
TOTAL IMPLEMENTED $14,809 $2,298 $4,186
67,198
kWh
- - $5,098
-
MMBtu
$5,525
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Wood Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs