Assessment Year | 2002 |
---|---|
Principal Product | material handeling equipment for the wire and fiber optic industries |
NAICS |
n/a
|
SIC | 3500: |
Sales Range | $10 M to 50M |
# of Employees | 43 |
Plant Area |
70,000
ft2
|
Annual Production | 63
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $53,510 | 687,106 |
kWh
|
$0.078 |
Other Energy | $92,885 | 18,577 |
MMBtu
|
$5.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $115,942 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,082 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Energy Savings |
---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,127 | $1,445 | - |
$4,127
-
MMBtu
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $939 | - |
$939
12,320
kWh
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $5,706 | - |
$5,706
63,866
kWh
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $6,391 | - |
$6,391
74,880
kWh
|
- | |
05 | 4.452: Eliminate shift | $10,752 | - |
$4,156
29,688
kWh
|
$6,596
-
MMBtu
|
|
06 | 2.1392: Replace purchased steam with other energy source | $88,027 | $55,497 | - |
$88,027
-
MMBtu
|
|
TOTAL RECOMMENDED | $115,942 | $56,942 |
$17,192
180,754
kWh
|
$98,750
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,082 | - |
$11,486
116,888
kWh
|
$6,596
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Energy Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs