ITAC Assessment: SU0133
ITAC logo
ITAC Assessment: SU0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Thermoformed Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 28
Plant Area 40,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,932 1,182,500
kWh
Electricity Demand $84,439 7,123
kW-mo/yr
Natural Gas $33,384 3,255
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,882 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.8118: Check for accuracy of utility / power meters $482 - - - $482 - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,025 - $1,025
11,387
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $339 $115 $339
3,766
kWh
- - - -
04 2.2135: Repair and eliminate steam leaks $675 $87 $675
7,500
kWh
- - - -
05 2.2511: Insulate bare equipment $754 $322 - - - $754
-
MMBtu
-
06 2.2511: Insulate bare equipment $1,110 $264 - - - $1,110
-
MMBtu
-
07 2.2511: Insulate bare equipment $2,774 $495 $2,774
30,823
kWh
- - - -
08 2.7135: Install occupancy sensors $123 $60 $123
1,212
kWh
- - - -
09 2.2437: Recover waste heat from equipment $314 $460 - - - $314
-
MMBtu
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $14 - $8
82
kWh
$6
-
kW-mo/yr
- - -
11 4.111: Add equipment/ operators to reduce production bottleneck $3,402 $13,000 - - - - $3,402
12 4.111: Add equipment/ operators to reduce production bottleneck $5,870 $4,230 - - - - $5,870
TOTAL RECOMMENDED $16,882 $19,033 $4,944
54,770
kWh
$6
-
kW-mo/yr
$482 $2,178
-
MMBtu
$9,272
TOTAL IMPLEMENTED $6,814 $1,343 $4,944
54,770
kWh
$6
-
kW-mo/yr
- $1,864
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs