Assessment Year 1997
Principal Product truck/trailer van bodies
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 39,000
ft2
Annual Production 1,050
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,534 799,531
kWh
Electricity Demand $37,689 2,651
kW-mo/yr
Electricity Fees $146 -
Natural Gas $22,893 5,099
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,242

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Primary Product Savings
01 2.3191: Use demand controller or load shedder $4,570 $1,000 - $4,570
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,292 $1,356 $288
15,826
kWh
$1,004
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,220 $420 $270
14,654
kWh
$950
-
kW-mo/yr
- - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $630 - - - $630
-
lb
- -
05 3.6192: Use a less expensive method of waste removal $450 - - - - $450
-
lb
-
06 4.111: Add equipment/ operators to reduce production bottleneck $35,100 $1,800 - - - - $35,100
TOTAL RECOMMENDED $43,262 $4,576 $558
30,480
kWh
$6,524
-
kW-mo/yr
$630
-
lb
$450
-
lb
$35,100
TOTAL IMPLEMENTED $38,242 $3,576 $558
30,480
kWh
$1,954
-
kW-mo/yr
$630
-
lb
- $35,100
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs