| Assessment Year | 2002 |
|---|---|
| Principal Product | Wood pallets and boxes |
| NAICS |
n/a
|
| SIC | 2448: Wood Pallets and Skids |
| Sales Range | $1 M to 5M |
| # of Employees | 70 |
| Plant Area |
61,509
ft2
|
| Annual Production | 200,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $50,078 | 767,550 |
kWh
|
$0.065 |
| Electricity Demand | $46,510 | 3,417 |
kW-mo/yr
|
$13.61 |
| Other Gas | $920 | 60 |
MMBtu
|
$15.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $146,095 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $524 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $217 | $518 |
$217
3,103
kWh
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $307 | $38 |
$307
4,386
kWh
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $442 | $871 |
$442
6,317
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,614 | $1,875 |
$1,763
25,182
kWh
|
$851
-
kW-mo/yr
|
- | |
| 05 | 4.131: Modify process to reduce material use/cost | $33,055 | $2,330 |
$11
162
kWh
|
- |
$33,044
-
MMBtu
|
|
| 06 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $109,460 | $1,150,000 |
$53,729
767,560
kWh
|
$55,731
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $146,095 | $1,155,632 |
$56,469
806,710
kWh
|
$56,582
-
kW-mo/yr
|
$33,044
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $524 | $556 |
$524
7,489
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs