ITAC Assessment: SU0121
ITAC logo
ITAC Assessment: SU0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product electro-mechanical switches
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 229
Plant Area 71,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,510 2,066,861
kWh
Electricity Demand $49,865 4,743
kW-mo/yr
Electricity Fees $21,029 -
Natural Gas $8,159 997
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,469

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $5,756 $450 $4,668
89,767
kWh
$1,088
-
kW-mo/yr
- -
02 2.7243: Improve air circulation with destratification fans / other methods $508 $945 - - $508
-
MMBtu
-
03 2.2511: Insulate bare equipment $1,001 $69 $1,001
19,251
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,452 - $1,452
27,926
kWh
- - -
05 3.5316: Contract a wood pallet recycling company $1,638 $271 - - - $1,638
06 2.4221: Install compressor air intakes in coolest locations $508 $230 $508
9,774
kWh
- - -
TOTAL RECOMMENDED $10,863 $1,965 $7,629
146,718
kWh
$1,088
-
kW-mo/yr
$508
-
MMBtu
$1,638
TOTAL IMPLEMENTED $3,469 $1,244 $2,961
56,951
kWh
- $508
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs