Assessment Year | 2001 |
---|---|
Principal Product | electro-mechanical switches |
NAICS |
n/a
|
SIC | 3625: Relays and Industrial Controls |
Sales Range | $10 M to 50M |
# of Employees | 229 |
Plant Area |
71,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,510 | 2,066,861 |
kWh
|
$0.052 |
Electricity Demand | $49,865 | 4,743 |
kW-mo/yr
|
$10.51 |
Electricity Fees | $21,029 | - |
|
- |
Natural Gas | $8,159 | 997 |
MMBtu
|
$8.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,469 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $5,756 | $450 |
$4,668
89,767
kWh
|
$1,088
-
kW-mo/yr
|
- | - | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $508 | $945 | - | - |
$508
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $1,001 | $69 |
$1,001
19,251
kWh
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,452 | - |
$1,452
27,926
kWh
|
- | - | - | |
05 | 3.5316: Contract a wood pallet recycling company | $1,638 | $271 | - | - | - | $1,638 | |
06 | 2.4221: Install compressor air intakes in coolest locations | $508 | $230 |
$508
9,774
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $10,863 | $1,965 |
$7,629
146,718
kWh
|
$1,088
-
kW-mo/yr
|
$508
-
MMBtu
|
$1,638 | ||
TOTAL IMPLEMENTED | $3,469 | $1,244 |
$2,961
56,951
kWh
|
- |
$508
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs