ITAC Assessment: SU0120
ITAC logo
ITAC Assessment: SU0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product bearing assemblies
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 220,000
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,064 7,764,370
kWh
Electricity Demand $173,409 25,887
kW-mo/yr
Electricity Fees $18,197 -
Natural Gas $393,634 51,376
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,447 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,106

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $1,106 - - - - - $1,106
02 2.3212: Optimize plant power factor $2,537 $8,750 - - $2,537 - -
03 2.7135: Install occupancy sensors $188 $30 $188
6,268
kWh
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $160 $840 $118
3,942
kWh
$42
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,600 - $3,600
120,000
kWh
- - - -
06 2.7293: Install dry sprinkler system or other method to reduce heating requirements $21,289 $75,000 $540
18,000
kWh
$67
-
kW-mo/yr
- $20,682
-
MMBtu
-
07 2.4226: Use / purchase optimum sized compressor $12,567 $20,000 $12,567
418,900
kWh
- - - -
TOTAL RECOMMENDED $41,447 $104,620 $17,013
567,110
kWh
$109
-
kW-mo/yr
$2,537 $20,682
-
MMBtu
$1,106
TOTAL IMPLEMENTED $1,106 - - - - - $1,106
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs