ITAC Assessment: SF0031
ITAC logo
ITAC Assessment: SF0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Chocolate
NAICS
n/a
SIC 2066: Chocolate and Cocoa Products
Sales Range $50
M
to 100
M
# of Employees 90
Plant Area 140,000
ft2
Annual Production 14,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,015,878 10,986,518
kWh
Natural Gas $132,902 30,007
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $425,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $227,021

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $4,958 $4,509 $4,958
53,634
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,549 $33,762 $12,549
135,698
kWh
- -
03 2.4314: Use synthetic lubricant $696 - $696
7,620
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,230 $20,590 $12,230
132,181
kWh
- -
05 2.8114: Change rate schedules or other changes in utility service $98,984 $180,000 - - $98,984
06 2.3212: Optimize plant power factor $8,918 $15,019 $8,918
-
kWh
- -
07 2.2511: Insulate bare equipment $110,530 $240,000 $110,243
1,192,263
kWh
$287
-
MMBtu
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $84,576 $104,500 $106,305
1,150,352
kWh
$(-21,729.0)
-
MMBtu
-
09 2.2437: Recover waste heat from equipment $91,771 $111,320 - $91,771
-
MMBtu
-
TOTAL RECOMMENDED $425,212 $709,700 $255,899
2,671,748
kWh
$70,329
-
MMBtu
$98,984
TOTAL IMPLEMENTED $227,021 $458,271 $127,750
1,381,595
kWh
$287
-
MMBtu
$98,984
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs