Assessment Year | 1994 |
---|---|
Principal Product | Chocolate |
NAICS |
n/a
|
SIC | 2066: Chocolate and Cocoa Products |
Sales Range | $50 M to 100M |
# of Employees | 90 |
Plant Area |
140,000
ft2
|
Annual Production | 14,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,015,878 | 10,986,518 |
kWh
|
$0.092 |
Natural Gas | $132,902 | 30,007 |
MMBtu
|
$4.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $425,212 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $227,021 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,958 | $4,509 |
$4,958
53,634
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,549 | $33,762 |
$12,549
135,698
kWh
|
- | - | |
03 | 2.4314: Use synthetic lubricant | $696 | - |
$696
7,620
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $12,230 | $20,590 |
$12,230
132,181
kWh
|
- | - | |
05 | 2.8114: Change rate schedules or other changes in utility service | $98,984 | $180,000 | - | - | $98,984 | |
06 | 2.3212: Optimize plant power factor | $8,918 | $15,019 |
$8,918
-
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $110,530 | $240,000 |
$110,243
1,192,263
kWh
|
$287
-
MMBtu
|
- | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $84,576 | $104,500 |
$106,305
1,150,352
kWh
|
$(-21,729.0)
-
MMBtu
|
- | |
09 | 2.2437: Recover waste heat from equipment | $91,771 | $111,320 | - |
$91,771
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $425,212 | $709,700 |
$255,899
2,671,748
kWh
|
$70,329
-
MMBtu
|
$98,984 | ||
TOTAL IMPLEMENTED | $227,021 | $458,271 |
$127,750
1,381,595
kWh
|
$287
-
MMBtu
|
$98,984 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs