Assessment Year | 2001 |
---|---|
Principal Product | Hydraulic Valves |
NAICS |
n/a
|
SIC | 3491: Industrial Valves |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
62,700
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,784
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,796 | 1,135,970 |
kWh
|
$0.065 |
Electricity Demand | $44,282 | 3,490 |
kW-mo/yr
|
$12.69 |
Electricity Fees | $3,930 | - |
|
- |
Natural Gas | $12,024 | 1,514 |
MMBtu
|
$7.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,791 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $392 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $8,949 | $30 |
$6,924
77,954
kWh
|
$2,025
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $392 | - |
$392
6,029
kWh
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $120 | $158 |
$120
1,839
kWh
|
- | - | - | |
04 | 3.4114: Replace city water with recycled water via cooling tower | $3,469 | $16,370 | - | - | - |
$3,469
-
Tgal
|
|
05 | 4.452: Eliminate shift | $20,861 | - |
$10,721
152,256
kWh
|
- | $10,140 | - | |
TOTAL RECOMMENDED | $33,791 | $16,558 |
$18,157
238,078
kWh
|
$2,025
-
kW-mo/yr
|
$10,140 |
$3,469
-
Tgal
|
||
TOTAL IMPLEMENTED | $392 | - |
$392
6,029
kWh
|
- | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs