ITAC Assessment: SU0117
ITAC logo
ITAC Assessment: SU0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Copper Wire
NAICS
n/a
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range n/a
# of Employees 190
Plant Area 140,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,470,108 35,126,948
kWh
Electricity Demand $153,399 50,160
kW-mo/yr
Electricity Fees $333,607 -
Natural Gas $15,310 11,941
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $191,498 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,501

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 3.1161: Eliminate/reduce an operation $7,264 $8,085 $7,264
172,966
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $768 - $580
13,800
kWh
$188
-
kW-mo/yr
- -
03 4.631: Install an uninteruptable power supply $153,410 $531,678 - - - $153,410
04 2.3212: Optimize plant power factor $12,307 $30,550 - - $12,307 -
05 2.4221: Install compressor air intakes in coolest locations $3,845 $158 $3,845
91,559
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,016 - $3,016
71,810
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,888 $20,600 $10,888
259,227
kWh
- - -
TOTAL RECOMMENDED $191,498 $591,071 $25,593
609,362
kWh
$188
-
kW-mo/yr
$12,307 $153,410
TOTAL IMPLEMENTED $15,501 $20,758 $15,313
364,586
kWh
$188
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs