Assessment Year | 2001 |
---|---|
Principal Product | Copper Wire |
NAICS |
n/a
|
SIC | 3351: Rolling, Drawing, and Extruding Of Copper |
Sales Range | n/a |
# of Employees | 190 |
Plant Area |
140,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,470,108 | 35,126,948 |
kWh
|
$0.042 |
Electricity Demand | $153,399 | 50,160 |
kW-mo/yr
|
$3.06 |
Electricity Fees | $333,607 | - |
|
- |
Natural Gas | $15,310 | 11,941 |
MMBtu
|
$1.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $191,498 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,501 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.1161: Eliminate/reduce an operation | $7,264 | $8,085 |
$7,264
172,966
kWh
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $768 | - |
$580
13,800
kWh
|
$188
-
kW-mo/yr
|
- | - | |
03 | 4.631: Install an uninteruptable power supply | $153,410 | $531,678 | - | - | - | $153,410 | |
04 | 2.3212: Optimize plant power factor | $12,307 | $30,550 | - | - | $12,307 | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $3,845 | $158 |
$3,845
91,559
kWh
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,016 | - |
$3,016
71,810
kWh
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,888 | $20,600 |
$10,888
259,227
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $191,498 | $591,071 |
$25,593
609,362
kWh
|
$188
-
kW-mo/yr
|
$12,307 | $153,410 | ||
TOTAL IMPLEMENTED | $15,501 | $20,758 |
$15,313
364,586
kWh
|
$188
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs