ITAC Assessment: ST0079
ITAC logo
ITAC Assessment: ST0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product EMBROIDERED EMBLEMS
NAICS
n/a
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 40,000,000
pieces
Production Hrs. Annual 4,375
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,285 1,167,057
kWh
Natural Gas $14,628 1,887
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,354

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $2,257 $6,000 $2,257
-
kWh
-
02 2.4133: Use most efficient type of electric motors $1,295 $2,833 $1,295
14,361
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $106 $46 $106
1,172
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $502 $110 $502
5,569
kWh
-
05 2.7226: Use computer programs to optimize hvac performance $8,933 $15,000 $8,933
99,062
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,982 - $1,982
21,981
kWh
-
07 2.7229: Air condition only space necessary $1,956 - $1,956
21,688
kWh
-
08 2.7261: Install timers and/or thermostats $4,642 $300 - $4,642
-
MMBtu
TOTAL RECOMMENDED $21,673 $24,289 $17,031
163,833
kWh
$4,642
-
MMBtu
TOTAL IMPLEMENTED $17,354 $18,243 $12,712
140,973
kWh
$4,642
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs