ITAC Assessment: CO0522
ITAC logo
ITAC Assessment: CO0522
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Metal missile cases
NAICS 332994: Small Arms, Ordnance, and Ordnance Accessories Manufacturing
SIC 3489: Ordnance and Accessories, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 56,730
ft2
Annual Production 17,400
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,829 1,059,600
kWh
Electricity Demand $44,251 3,643
kW-mo/yr
LPG $13,330 1,586
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,084 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,140 $10,660 $3,660
93,600
kWh
$8,840
-
kW-mo/yr
$(-3,360.0)
-
MMBtu
- -
02 2.8114: Change rate schedules or other changes in utility service $4,420 $10,000 - $4,420
-
kW-mo/yr
- - -
03 2.3191: Use demand controller or load shedder $4,300 $840 - - - $4,300 -
04 2.7224: Reduce space conditioning during non-working hours $1,870 $1,950 $1,960
50,000
kWh
$(-700.0)
-
kW-mo/yr
$610
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $170 $414 $76
1,950
kWh
$112
-
kW-mo/yr
- - $(-18.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $184 $308 $68
1,716
kWh
$96
-
kW-mo/yr
- - $20
TOTAL RECOMMENDED $20,084 $24,172 $5,764
147,266
kWh
$12,768
-
kW-mo/yr
$(-2,750.0)
-
MMBtu
$4,300 $2
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs