Assessment Year | 1986 |
---|---|
Principal Product | FLEXIBLE PACKAGING MATER |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
n/a
|
Annual Production | 10,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $183,345 | 2,376,905 |
kWh
|
$0.077 |
Natural Gas | $61,162 | 9,368 |
MMBtu
|
$6.53 |
Fuel Oil #2 | $10,477 | 1,400 |
MMBtu
|
$7.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,167 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,167 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $2,865 | $105 | - |
$1,966
-
MMBtu
|
$899
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $904 | $1,600 | - |
$904
-
MMBtu
|
- | |
03 | 2.6121: Reduce hot water temperature to the minimum required | $509 | - |
$509
6,741
kWh
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $463 | $1,500 |
$716
9,379
kWh
|
$(-253.0)
-
MMBtu
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,395 | $7,000 |
$6,803
88,218
kWh
|
$(-2,408.0)
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,882 | $10,665 |
$4,882
63,306
kWh
|
- | - | |
07 | 2.7226: Use computer programs to optimize hvac performance | $31,161 | - |
$31,161
404,162
kWh
|
- | - | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,988 | $1,456 |
$4,626
60,082
kWh
|
$(-1,638.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $48,167 | $22,326 |
$48,697
631,888
kWh
|
$(-1,429.0)
-
MMBtu
|
$899
-
MMBtu
|
||
TOTAL IMPLEMENTED | $48,167 | $22,326 |
$48,697
631,888
kWh
|
$(-1,429.0)
-
MMBtu
|
$899
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs