ITAC Assessment: ST0055
ITAC logo
ITAC Assessment: ST0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product METAL & PLASTIC STAMPING
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area
n/a
Annual Production 7,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,577 1,361,079
kWh
Natural Gas $4,236 635
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,705 $571 $1,705
14,361
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $731 - $731
6,155
kWh
-
03 2.7226: Use computer programs to optimize hvac performance $5,219 $10,500 $5,219
43,962
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $417 $250 $417
3,517
kWh
-
05 2.6121: Reduce hot water temperature to the minimum required $626 - $626
5,275
kWh
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,030 $3,750 $1,357
11,430
kWh
$(-327.0)
-
MMBtu
07 2.2437: Recover waste heat from equipment $834 $2,400 - $834
-
MMBtu
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $383 $590 $383
3,224
kWh
-
TOTAL RECOMMENDED $10,945 $18,061 $10,438
87,924
kWh
$507
-
MMBtu
TOTAL IMPLEMENTED $10,562 $17,471 $10,055
84,700
kWh
$507
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs