Assessment Year | 1986 |
---|---|
Principal Product | METAL & PLASTIC STAMPING |
NAICS |
n/a
|
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 92 |
Plant Area |
n/a
|
Annual Production | 7,000,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $161,577 | 1,361,079 |
kWh
|
$0.12 |
Natural Gas | $4,236 | 635 |
MMBtu
|
$6.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,945 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,562 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,705 | $571 |
$1,705
14,361
kWh
|
- | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $731 | - |
$731
6,155
kWh
|
- | |
03 | 2.7226: Use computer programs to optimize hvac performance | $5,219 | $10,500 |
$5,219
43,962
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $417 | $250 |
$417
3,517
kWh
|
- | |
05 | 2.6121: Reduce hot water temperature to the minimum required | $626 | - |
$626
5,275
kWh
|
- | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,030 | $3,750 |
$1,357
11,430
kWh
|
$(-327.0)
-
MMBtu
|
|
07 | 2.2437: Recover waste heat from equipment | $834 | $2,400 | - |
$834
-
MMBtu
|
|
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $383 | $590 |
$383
3,224
kWh
|
- | |
TOTAL RECOMMENDED | $10,945 | $18,061 |
$10,438
87,924
kWh
|
$507
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,562 | $17,471 |
$10,055
84,700
kWh
|
$507
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs