ITAC Assessment: ST0053
ITAC logo
ITAC Assessment: ST0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product INDUSTRIAL STEEL RINGS
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 4,625
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,505 802,169
kWh
Natural Gas $61,557 10,703
MMBtu
Fuel Oil #2 $9,320 1,260
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,747 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,872

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $414 $500 $414
4,103
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,959 $140 $3,959
38,980
kWh
- -
03 2.4312: Improve lubrication practices $2,164 $250 $2,164
21,395
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $482 $100 $482
4,689
kWh
- -
05 2.2511: Insulate bare equipment $1,204 $400 - $1,204
-
MMBtu
-
06 2.2511: Insulate bare equipment $1,220 $650 - $1,220
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,391 $554 $3,391
33,411
kWh
- -
08 2.7221: Lower temperature during the winter season and vice-versa $3,913 - - $1,694
-
MMBtu
$2,219
-
MMBtu
TOTAL RECOMMENDED $16,747 $2,594 $10,410
102,578
kWh
$4,118
-
MMBtu
$2,219
-
MMBtu
TOTAL IMPLEMENTED $7,872 $140 $3,959
38,980
kWh
$1,694
-
MMBtu
$2,219
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs