Assessment Year | 1986 |
---|---|
Principal Product | INDUSTRIAL STEEL RINGS |
NAICS |
n/a
|
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 40 |
Plant Area |
n/a
|
Annual Production | 2,000,000
lb
|
Production Hrs. Annual | 4,625
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $81,505 | 802,169 |
kWh
|
$0.10 |
Natural Gas | $61,557 | 10,703 |
MMBtu
|
$5.75 |
Fuel Oil #2 | $9,320 | 1,260 |
MMBtu
|
$7.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,747 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,872 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $414 | $500 |
$414
4,103
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,959 | $140 |
$3,959
38,980
kWh
|
- | - | |
03 | 2.4312: Improve lubrication practices | $2,164 | $250 |
$2,164
21,395
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $482 | $100 |
$482
4,689
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $1,204 | $400 | - |
$1,204
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $1,220 | $650 | - |
$1,220
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,391 | $554 |
$3,391
33,411
kWh
|
- | - | |
08 | 2.7221: Lower temperature during the winter season and vice-versa | $3,913 | - | - |
$1,694
-
MMBtu
|
$2,219
-
MMBtu
|
|
TOTAL RECOMMENDED | $16,747 | $2,594 |
$10,410
102,578
kWh
|
$4,118
-
MMBtu
|
$2,219
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,872 | $140 |
$3,959
38,980
kWh
|
$1,694
-
MMBtu
|
$2,219
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs