ITAC Assessment: ST0048
ITAC logo
ITAC Assessment: ST0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PRINTING & BINDING
NAICS
n/a
SIC 2741: Miscellaneous Publishing
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area
n/a
Annual Production 4,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,048 1,971,864
kWh
Natural Gas $18,347 2,528
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,259 $735 $8,259
99,941
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,750 $56 $7,750
93,787
kWh
- -
03 2.6121: Reduce hot water temperature to the minimum required $1,126 - $920
11,137
kWh
$206
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $485 $2,598 $485
5,862
kWh
- -
05 2.4312: Improve lubrication practices $102 - $702
8,499
kWh
- $(-600.0)
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $339 $675 $339
4,103
kWh
- -
07 2.7221: Lower temperature during the winter season and vice-versa $4,311 - $4,311
52,169
kWh
- -
08 2.7447: Install vinyl strip / high speed / air curtain doors $335 $22 - $335
-
MMBtu
-
09 2.7229: Air condition only space necessary $2,371 $700 - $2,371
-
MMBtu
-
10 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,899 $2,500 $3,003
36,342
kWh
$(-1,104.0)
-
MMBtu
-
11 2.7261: Install timers and/or thermostats $2,881 $440 - $2,881
-
MMBtu
-
TOTAL RECOMMENDED $29,858 $7,726 $25,769
311,840
kWh
$4,689
-
MMBtu
$(-600.0)
TOTAL IMPLEMENTED $17,955 $3,411 $17,414
210,727
kWh
$541
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs