Assessment Year | 1985 |
---|---|
Principal Product | PRINTING & BINDING |
NAICS |
n/a
|
SIC | 2741: Miscellaneous Publishing |
Sales Range | $10 M to 50M |
# of Employees | 290 |
Plant Area |
n/a
|
Annual Production | 4,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $163,048 | 1,971,864 |
kWh
|
$0.083 |
Natural Gas | $18,347 | 2,528 |
MMBtu
|
$7.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,858 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,955 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,259 | $735 |
$8,259
99,941
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,750 | $56 |
$7,750
93,787
kWh
|
- | - | |
03 | 2.6121: Reduce hot water temperature to the minimum required | $1,126 | - |
$920
11,137
kWh
|
$206
-
MMBtu
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $485 | $2,598 |
$485
5,862
kWh
|
- | - | |
05 | 2.4312: Improve lubrication practices | $102 | - |
$702
8,499
kWh
|
- | $(-600.0) | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $339 | $675 |
$339
4,103
kWh
|
- | - | |
07 | 2.7221: Lower temperature during the winter season and vice-versa | $4,311 | - |
$4,311
52,169
kWh
|
- | - | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $335 | $22 | - |
$335
-
MMBtu
|
- | |
09 | 2.7229: Air condition only space necessary | $2,371 | $700 | - |
$2,371
-
MMBtu
|
- | |
10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,899 | $2,500 |
$3,003
36,342
kWh
|
$(-1,104.0)
-
MMBtu
|
- | |
11 | 2.7261: Install timers and/or thermostats | $2,881 | $440 | - |
$2,881
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $29,858 | $7,726 |
$25,769
311,840
kWh
|
$4,689
-
MMBtu
|
$(-600.0) | ||
TOTAL IMPLEMENTED | $17,955 | $3,411 |
$17,414
210,727
kWh
|
$541
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs