Assessment Year | 1985 |
---|---|
Principal Product | GROOV-PINS,THREADED |
NAICS |
n/a
|
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
n/a
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $117,189 | 1,281,946 |
kWh
|
$0.091 |
Natural Gas | $7,912 | 1,161 |
MMBtu
|
$6.81 |
Fuel Oil #4 | $17,576 | 2,966 |
MMBtu
|
$5.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,518 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,824 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #4 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4312: Improve lubrication practices | $1,340 | - |
$2,940
32,239
kWh
|
- | $(-1,600.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,472 | $1,038 |
$4,472
48,945
kWh
|
- | - | |
03 | 2.3191: Use demand controller or load shedder | $4,093 | $1,900 |
$4,093
-
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $280 | $412 |
$280
2,931
kWh
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $618 | $706 |
$618
6,741
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,455 | $128 |
$3,455
37,808
kWh
|
- | - | |
07 | 2.4227: Use compressor air filters | $403 | - |
$463
4,982
kWh
|
- | $(-60.0) | |
08 | 2.4221: Install compressor air intakes in coolest locations | $214 | $100 |
$214
2,345
kWh
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $233 | - |
$233
2,638
kWh
|
- | - | |
10 | 2.7243: Improve air circulation with destratification fans / other methods | $1,410 | $560 |
$(-96.0)
(-1,172)
kWh
|
$1,506
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $16,518 | $4,844 |
$16,672
137,457
kWh
|
$1,506
-
MMBtu
|
$(-1,660.0) | ||
TOTAL IMPLEMENTED | $8,824 | $1,678 |
$8,884
97,011
kWh
|
- | $(-60.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #4 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs