ITAC Assessment: ST0030
ITAC logo
ITAC Assessment: ST0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PROD. & MRKT. LEGAL SUPP
NAICS
n/a
SIC 2761: Manifold Business Forms
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area
n/a
Annual Production 2,500,000
lb
Production Hrs. Annual 2,800
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,921 1,732,415
kWh
Natural Gas $3,721 434
MMBtu
Fuel Oil #2 $16,093 2,479
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,255 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,135

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,708 $1,846 $4,708
50,117
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $281 $18 $281
2,931
kWh
- -
03 2.6121: Reduce hot water temperature to the minimum required $1,447 - $807
8,499
kWh
$640
-
MMBtu
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $892 $420 $1,479
15,826
kWh
$(-587.0)
-
MMBtu
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $833 $1,080 $1,379
14,654
kWh
$(-546.0)
-
MMBtu
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,090 $83 $18
293
kWh
- $1,072
-
MMBtu
07 2.7224: Reduce space conditioning during non-working hours $5,609 - - - $5,609
-
MMBtu
08 2.2511: Insulate bare equipment $1,395 $3,038 - - $1,395
-
MMBtu
TOTAL RECOMMENDED $16,255 $6,485 $8,672
92,320
kWh
$(-493.0)
-
MMBtu
$8,076
-
MMBtu
TOTAL IMPLEMENTED $13,135 $1,947 $5,814
61,840
kWh
$640
-
MMBtu
$6,681
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings