Assessment Year | 1985 |
---|---|
Principal Product | PROD. & MRKT. LEGAL SUPP |
NAICS |
n/a
|
SIC | 2761: Manifold Business Forms |
Sales Range | $10 M to 50M |
# of Employees | 375 |
Plant Area |
n/a
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 2,800
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $162,921 | 1,732,415 |
kWh
|
$0.094 |
Natural Gas | $3,721 | 434 |
MMBtu
|
$8.57 |
Fuel Oil #2 | $16,093 | 2,479 |
MMBtu
|
$6.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,255 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,135 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,708 | $1,846 |
$4,708
50,117
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $281 | $18 |
$281
2,931
kWh
|
- | - | |
03 | 2.6121: Reduce hot water temperature to the minimum required | $1,447 | - |
$807
8,499
kWh
|
$640
-
MMBtu
|
- | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $892 | $420 |
$1,479
15,826
kWh
|
$(-587.0)
-
MMBtu
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $833 | $1,080 |
$1,379
14,654
kWh
|
$(-546.0)
-
MMBtu
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,090 | $83 |
$18
293
kWh
|
- |
$1,072
-
MMBtu
|
|
07 | 2.7224: Reduce space conditioning during non-working hours | $5,609 | - | - | - |
$5,609
-
MMBtu
|
|
08 | 2.2511: Insulate bare equipment | $1,395 | $3,038 | - | - |
$1,395
-
MMBtu
|
|
TOTAL RECOMMENDED | $16,255 | $6,485 |
$8,672
92,320
kWh
|
$(-493.0)
-
MMBtu
|
$8,076
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,135 | $1,947 |
$5,814
61,840
kWh
|
$640
-
MMBtu
|
$6,681
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs