ITAC Assessment: MA0080
ITAC logo
ITAC Assessment: MA0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product COPPER WIRE
NAICS
n/a
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 18,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $776,873 8,496,776
kWh
Natural Gas $73,329 11,980
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $143,206 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,637

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,100 $3,000 $5,100
-
kWh
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $44,537 $600 $44,537
-
kWh
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $93,569 - $93,569
-
kWh
TOTAL RECOMMENDED $143,206 $3,600 $143,206
-
kWh
TOTAL IMPLEMENTED $49,637 $3,600 $49,637
-
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs