ITAC Assessment: CO0549
ITAC logo
ITAC Assessment: CO0549
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Pressure sensitive tape
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 400,000
ft2
Annual Production 133,000,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $460,227 14,863,000
kWh
Electricity Demand $419,173 37,333
kW-mo/yr
Electricity Fees $1,479 -
Natural Gas $486,631 107,967
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,920 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $29,210 $116,000 $13,410
650,800
kWh
$15,800
-
kW-mo/yr
- -
02 2.2414: Use waste heat from hot flue gases to preheat $12,000 $27,900 - - $12,000
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $6,130 $3,800 - - $6,130
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,920 $510 $2,720
132,000
kWh
$3,200
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,780 $60 $2,180
106,040
kWh
$3,600
-
kW-mo/yr
- -
06 2.6242: Minimize operation of equipment maintained in standby condition $650 $500 $650
31,700
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $390 $360 $180
8,800
kWh
$210
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $21,840 $58,140 $12,370
600,400
kWh
$14,580
-
kW-mo/yr
- $(-5,110.0)
TOTAL RECOMMENDED $81,920 $207,270 $31,510
1,529,740
kWh
$37,390
-
kW-mo/yr
$18,130
-
MMBtu
$(-5,110.0)
TOTAL IMPLEMENTED $28,410 $59,150 $15,740
764,100
kWh
$17,780
-
kW-mo/yr
- $(-5,110.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs