Assessment Year | 1985 |
---|---|
Principal Product | WEB & SHEET FED PRINTING |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $245,465 | 3,203,107 |
kWh
|
$0.077 |
Natural Gas | $77,280 | 12,555 |
MMBtu
|
$6.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,020 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,237 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,678 | $56 |
$7,678
100,234
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,468 | $1,367 |
$4,468
58,324
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $2,533 | $700 | - |
$2,533
-
MMBtu
|
|
04 | 2.1123: Install automatic stack damper | $766 | $880 | - |
$766
-
MMBtu
|
|
05 | 2.6121: Reduce hot water temperature to the minimum required | $964 | - |
$831
10,844
kWh
|
$133
-
MMBtu
|
|
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,073 | $400 |
$1,616
21,102
kWh
|
$(-543.0)
-
MMBtu
|
|
07 | 2.7224: Reduce space conditioning during non-working hours | $3,713 | $178 |
$1,325
17,292
kWh
|
$2,388
-
MMBtu
|
|
08 | 2.7441: Replace broken windows and/or window sash | $1,042 | $42 |
$180
2,345
kWh
|
$862
-
MMBtu
|
|
09 | 2.2437: Recover waste heat from equipment | $5,783 | $23,000 | - |
$5,783
-
MMBtu
|
|
TOTAL RECOMMENDED | $28,020 | $26,623 |
$16,098
210,141
kWh
|
$11,922
-
MMBtu
|
||
TOTAL IMPLEMENTED | $22,237 | $3,623 |
$16,098
210,141
kWh
|
$6,139
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs