ITAC Assessment: AM0837
ITAC logo
ITAC Assessment: AM0837
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Fiber-Reinforced Plastic
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 120,000
ft2
Annual Production 3,500
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,210 3,620,217
kWh
Electricity Demand $83,513 9,758
kW-mo/yr
Electricity Fees $2,019 -
Natural Gas $97,447 24,197
MMBtu
TOTAL YEARLY COSTS $358,189
RECOMMENDED SAVINGS* $40,691 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $38,354 $95,530 - - - $38,354
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,092 $1,225 $670
14,560
kWh
$422
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $955 $75 $425
9,230
kWh
$530
-
kW-mo/yr
- -
04 2.8123: Pay utility bills on time $197 - - - $197 -
05 2.4239: Eliminate or reduce compressed air usage $93 $158 $93
2,033
kWh
- - -
TOTAL RECOMMENDED $40,691 $96,988 $1,188
25,823
kWh
$952
-
kW-mo/yr
$197 $38,354
-
MMBtu
TOTAL IMPLEMENTED $2,244 $1,300 $1,095
23,790
kWh
$952
-
kW-mo/yr
$197 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs