Assessment Year | 2013 |
---|---|
Principal Product | Tools |
NAICS | 335991: Carbon and Graphite Product Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 600 |
Plant Area |
116,114
ft2
|
Annual Production | 197,223
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $209,391 | 2,831,200 |
kWh
|
$0.074 |
Electricity Demand | $34,382 | 7,019 |
kW-mo/yr
|
$4.90 |
Electricity Fees | $24,190 | - |
|
- |
Natural Gas | $88,652 | 12,310 |
MMBtu
|
$7.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,148 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7311: Ventilation system to shut off when room is not in use | $7,073 | $2,342 |
$7,073
99,122
kWh
|
- | - | - | - | |
02 | 2.5123: Reduce fluid flow rates | $2,879 | $6,200 |
$2,879
40,345
kWh
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,300 | $50,000 |
$17,182
240,776
kWh
|
$2,989
-
kW-mo/yr
|
- | $1,914 | $1,215 | |
04 | 2.2437: Recover waste heat from equipment | $679 | $1,677 | - | - |
$679
-
MMBtu
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,667 | $2,342 |
$525
7,355
kWh
|
$1,142
-
kW-mo/yr
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $4,550 | $13,225 | - | - |
$4,550
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $40,148 | $75,786 |
$27,659
387,598
kWh
|
$4,131
-
kW-mo/yr
|
$5,229
-
MMBtu
|
$1,914 | $1,215 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs