ITAC Assessment: OR0619
ITAC logo
ITAC Assessment: OR0619
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Tools
NAICS 335991: Carbon and Graphite Product Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 600
Plant Area 116,114
ft2
Annual Production 197,223
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,391 2,831,200
kWh
Electricity Demand $34,382 7,019
kW-mo/yr
Electricity Fees $24,190 -
Natural Gas $88,652 12,310
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,148 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7311: Ventilation system to shut off when room is not in use $7,073 $2,342 $7,073
99,122
kWh
- - - -
02 2.5123: Reduce fluid flow rates $2,879 $6,200 $2,879
40,345
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $23,300 $50,000 $17,182
240,776
kWh
$2,989
-
kW-mo/yr
- $1,914 $1,215
04 2.2437: Recover waste heat from equipment $679 $1,677 - - $679
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,667 $2,342 $525
7,355
kWh
$1,142
-
kW-mo/yr
- - -
06 2.2437: Recover waste heat from equipment $4,550 $13,225 - - $4,550
-
MMBtu
- -
TOTAL RECOMMENDED $40,148 $75,786 $27,659
387,598
kWh
$4,131
-
kW-mo/yr
$5,229
-
MMBtu
$1,914 $1,215
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs