| Assessment Year | 1984 |
|---|---|
| Principal Product | ROTARY & IMPRINT PRINTER |
| NAICS |
n/a
|
| SIC | 3555: Printing Trades Machinery and Equipment |
| Sales Range | $1 M to 5M |
| # of Employees | 61 |
| Plant Area |
n/a
|
| Annual Production | 500,000
lb
|
| Production Hrs. Annual | 2,500
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $17,628 | 164,127 |
kWh
|
$0.11 |
| Natural Gas | $5,094 | 709 |
MMBtu
|
$7.18 |
| Fuel Oil #2 | $7,113 | 840 |
MMBtu
|
$8.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,183 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,576 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,275 | $212 |
$2,275
21,102
kWh
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $201 | $537 | - |
$201
-
MMBtu
|
- | |
| 03 | 2.6214: Shut off pilots in standby equipment | $50 | - | - |
$50
-
MMBtu
|
- | |
| 04 | 2.6121: Reduce hot water temperature to the minimum required | $136 | - | - |
$136
-
MMBtu
|
- | |
| 05 | 2.2136: Install / repair insulation on steam lines | $40 | $50 | - | - |
$40
-
MMBtu
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $32 | $28 |
$32
293
kWh
|
- | - | |
| 07 | 2.1123: Install automatic stack damper | $251 | $60 | - |
$251
-
MMBtu
|
- | |
| 08 | 2.7221: Lower temperature during the winter season and vice-versa | $2,149 | - | - |
$1,178
-
MMBtu
|
$971
-
MMBtu
|
|
| 09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $679 | $130 | - | - |
$679
-
MMBtu
|
|
| 10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $370 | $750 | - |
$244
-
MMBtu
|
$126
-
MMBtu
|
|
| TOTAL RECOMMENDED | $6,183 | $1,767 |
$2,307
21,395
kWh
|
$2,060
-
MMBtu
|
$1,816
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,576 | $587 | - |
$1,565
-
MMBtu
|
$1,011
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs