ITAC Assessment: ST0006
ITAC logo
ITAC Assessment: ST0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product WINE CHILLERS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 36
Plant Area
n/a
Annual Production 90,000
pieces
Production Hrs. Annual 2,193
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,480 97,011
kWh
Natural Gas $16,410 2,374
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,341 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,673

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,274 $537 - $1,274
-
MMBtu
02 2.6121: Reduce hot water temperature to the minimum required $64 - - $64
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,291 $48 $6,291
48,945
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,138 $307 $1,138
8,792
kWh
-
05 2.1123: Install automatic stack damper $1,172 $2,162 - $1,172
-
MMBtu
06 2.7229: Air condition only space necessary $56 - - $56
-
MMBtu
07 2.7221: Lower temperature during the winter season and vice-versa $8,044 - - $8,044
-
MMBtu
08 2.7441: Replace broken windows and/or window sash $302 $99 - $302
-
MMBtu
TOTAL RECOMMENDED $18,341 $3,153 $7,429
57,737
kWh
$10,912
-
MMBtu
TOTAL IMPLEMENTED $15,673 $585 $6,291
48,945
kWh
$9,382
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs