Assessment Year | 1984 |
---|---|
Principal Product | CAST ACRYLIC SHEETS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 145 |
Plant Area |
n/a
|
Annual Production | 40,000
pieces
|
Production Hrs. Annual | 6,900
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $202,424 | 2,970,985 |
kWh
|
$0.068 |
Natural Gas | $15,042 | 2,393 |
MMBtu
|
$6.29 |
Fuel Oil #2 | $103,550 | 13,300 |
MMBtu
|
$7.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,079 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,079 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,350 | $1,354 |
$6,350
93,200
kWh
|
- | - | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $1,321 | $720 |
$(-284.0)
(-4,103)
kWh
|
$1,605
-
MMBtu
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $1,210 | $350 | - | - |
$1,210
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,781 | $32 |
$9,781
143,611
kWh
|
- | - | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $4,348 | - | - |
$4,348
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,698 | $269 | - | - |
$5,698
-
MMBtu
|
|
07 | 2.2437: Recover waste heat from equipment | $4,579 | $268 | - | - |
$4,579
-
MMBtu
|
|
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $926 | $269 | - |
$926
-
MMBtu
|
- | |
09 | 2.7446: Utilize sensors controlling roof and wall openings | $866 | $846 | - |
$866
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $35,079 | $4,108 |
$15,847
232,708
kWh
|
$7,745
-
MMBtu
|
$11,487
-
MMBtu
|
||
TOTAL IMPLEMENTED | $35,079 | $4,108 |
$15,847
232,708
kWh
|
$7,745
-
MMBtu
|
$11,487
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs