ITAC Assessment: ST0004
ITAC logo
ITAC Assessment: ST0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product STEEL FABRICATIONS
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 400,000
lb
Production Hrs. Annual 2,875
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,436 182,005
kWh
Natural Gas $135 9
MMBtu
Fuel Oil #2 $5,727 700
MMBtu
Fuel Oil #4 $5,727 864
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,550

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Fuel Oil #4 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $599 $537 - $315
-
MMBtu
$284
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,185 $200 $1,185
9,086
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,058 $40 $1,058
8,206
kWh
- -
04 2.7243: Improve air circulation with destratification fans / other methods $583 $1,480 - - $583
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $990 $960 - $520
-
MMBtu
$470
-
MMBtu
06 2.7441: Replace broken windows and/or window sash $4,135 $845 - - $4,135
-
MMBtu
TOTAL RECOMMENDED $8,550 $4,062 $2,243
17,292
kWh
$835
-
MMBtu
$5,472
-
MMBtu
TOTAL IMPLEMENTED $8,550 $4,062 $2,243
17,292
kWh
$835
-
MMBtu
$5,472
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs