ITAC Assessment: SJ0027
ITAC logo
ITAC Assessment: SJ0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Wholesale fresh fish
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 28,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Hawaii

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $661,707 2,036,588
kWh
Electricity Demand $81,234 5,954
kW-mo/yr
TOTAL YEARLY COSTS $742,941
RECOMMENDED SAVINGS* $129,152 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $89,704 $333,155 $87,521
269,296
kWh
$2,183
-
kW-mo/yr
02 2.7447: Install vinyl strip / high speed / air curtain doors $32,211 $22,296 $32,211
99,111
kWh
-
03 2.6218: Turn off equipment when not in use $3,400 - $3,400
10,460
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,837 $1,550 $3,793
11,670
kWh
$44
-
kW-mo/yr
TOTAL RECOMMENDED $129,152 $357,001 $126,925
390,537
kWh
$2,227
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs