ITAC Assessment: SJ0011
ITAC logo
ITAC Assessment: SJ0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product metal powder coating
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 70,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 2,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,075 974,895
kWh
Natural Gas $268,792 15,161
MMBtu
TOTAL YEARLY COSTS $529,867
RECOMMENDED SAVINGS* $280,719 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,389

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $37,495 $51,522 $37,495
139,908
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,700 $28,158 $27,700
103,437
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $787 $622 $787
2,938
kWh
- -
04 2.2437: Recover waste heat from equipment $4,268 $3,475 - - $4,268
-
MMBtu
05 2.6231: Utilize controls to operate equipment only when needed $1,528 $468 $1,528
5,707
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $13 $71 $13
48
kWh
- -
07 2.3132: Recharge batteries on during off-peak demand periods $1,389 - - $1,389 -
08 2.9114: Use solar heat to make electricty $207,539 $726,190 $207,539
774,981
kWh
- -
TOTAL RECOMMENDED $280,719 $810,506 $275,062
1,027,019
kWh
$1,389 $4,268
-
MMBtu
TOTAL IMPLEMENTED $1,389 - - $1,389 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs