ITAC Assessment: SF0645
ITAC logo
ITAC Assessment: SF0645
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 29,500
ft2
Annual Production 200,000
units
Production Hrs. Annual 2,145
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,490 515,099
kWh
Electricity Demand $35,276 1,600
kW-mo/yr
TOTAL YEARLY COSTS $182,766
RECOMMENDED SAVINGS* $161,221 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $16,596 - $16,596
57,969
kWh
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,136 - $8,712
30,430
kWh
- - $(-576.0) - -
03 2.3132: Recharge batteries on during off-peak demand periods $1,633 $1,533 - - $1,633 - - -
04 2.7224: Reduce space conditioning during non-working hours $1,021 $993 $1,021
3,565
kWh
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,130 $4,629 $2,603
9,091
kWh
$1,429
-
kW-mo/yr
- $50 $48 -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,551 $15,612 $7,551
26,373
kWh
- - - - -
07 2.6231: Utilize controls to operate equipment only when needed $1,516 $4,420 $1,516
5,295
kWh
- - - - -
08 2.9114: Use solar heat to make electricty $78,810 $448,680 $78,810
275,272
kWh
- - - - -
09 4.132: Purchase new equipment to reduce material use / cost $41,828 $26,380 - - - - - $41,828
TOTAL RECOMMENDED $161,221 $502,247 $116,809
407,995
kWh
$1,429
-
kW-mo/yr
$1,633 $(-526.0) $48 $41,828
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs