ITAC Assessment: LE0397
ITAC logo
ITAC Assessment: LE0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product fast food carton
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $500
k
to 1
M
# of Employees 73
Plant Area 227,500
ft2
Annual Production 578,131,275
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,790 1,888,800
kWh
Electricity Demand $14,267 4,020
kW-mo/yr
Electricity Fees $19,147 -
Natural Gas $60,503 7,699
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,973 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,733

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,085 $4,300 $6,705
98,603
kWh
$380
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,221 $10,086 $12,782
187,975
kWh
$909
-
kW-mo/yr
$530
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,396 $1,000 $1,236
18,179
kWh
$160
-
kW-mo/yr
-
04 2.2614: Use cooling tower or economizer to replace chiller cooling $2,238 $5,500 $2,089
30,716
kWh
$149
-
kW-mo/yr
-
05 2.4226: Use / purchase optimum sized compressor $4,917 $14,900 $4,566
67,140
kWh
$351
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $116 $1,914 $105
1,548
kWh
$11
-
kW-mo/yr
-
TOTAL RECOMMENDED $29,973 $37,700 $27,483
404,161
kWh
$1,960
-
kW-mo/yr
$530
TOTAL IMPLEMENTED $15,733 $13,000 $14,124
207,702
kWh
$1,079
-
kW-mo/yr
$530
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs