Assessment Year | 2015 |
---|---|
Principal Product | fast food carton |
NAICS | 322212: Folding Paperboard Box Manufacturing |
SIC | 2657: Folding Paperboard Boxes, Including Sanitary |
Sales Range | $500 k to 1M |
# of Employees | 73 |
Plant Area |
227,500
ft2
|
Annual Production | 578,131,275
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $128,790 | 1,888,800 |
kWh
|
$0.068 |
Electricity Demand | $14,267 | 4,020 |
kW-mo/yr
|
$3.55 |
Electricity Fees | $19,147 | - |
|
- |
Natural Gas | $60,503 | 7,699 |
MMBtu
|
$7.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,973 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,733 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,085 | $4,300 |
$6,705
98,603
kWh
|
$380
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,221 | $10,086 |
$12,782
187,975
kWh
|
$909
-
kW-mo/yr
|
$530 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,396 | $1,000 |
$1,236
18,179
kWh
|
$160
-
kW-mo/yr
|
- | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,238 | $5,500 |
$2,089
30,716
kWh
|
$149
-
kW-mo/yr
|
- | |
05 | 2.4226: Use / purchase optimum sized compressor | $4,917 | $14,900 |
$4,566
67,140
kWh
|
$351
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $116 | $1,914 |
$105
1,548
kWh
|
$11
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $29,973 | $37,700 |
$27,483
404,161
kWh
|
$1,960
-
kW-mo/yr
|
$530 | ||
TOTAL IMPLEMENTED | $15,733 | $13,000 |
$14,124
207,702
kWh
|
$1,079
-
kW-mo/yr
|
$530 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs