ITAC Assessment: SF0633
ITAC logo
ITAC Assessment: SF0633
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range greater than $500
M
# of Employees 500
Plant Area 958,320
ft2
Annual Production 1,200,000
bbl
Production Hrs. Annual 8,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $769,436 3,682,044
kWh
Electricity Demand $646,771 15,962
kW-mo/yr
Natural Gas $1,529,072 166,221
MMBtu
Waste Disposal Costs
Water Usage $104,921 108,368,789
Tgal
Water Disposal $305,397 78,307,674
Tgal
TOTAL YEARLY COSTS $3,355,597
RECOMMENDED SAVINGS* $362,533 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $28,680 - $29,880
142,968
kWh
- - - - $(-1,200.0)
02 2.6218: Turn off equipment when not in use $3,867 - $3,867
18,509
kWh
- - - - -
03 2.2135: Repair and eliminate steam leaks $2,640 - - - $3,740
-
MMBtu
- - $(-1,100.0)
04 2.6231: Utilize controls to operate equipment only when needed $12,083 $2,208 $12,083
57,813
kWh
- - - - -
05 2.6231: Utilize controls to operate equipment only when needed $32,787 $17,210 $25,689
122,923
kWh
$7,098
-
kW-mo/yr
- - - -
06 2.2511: Insulate bare equipment $3,235 $4,152 $1,202
5,754
kWh
- $2,033
-
MMBtu
- - -
07 2.4239: Eliminate or reduce compressed air usage $10,943 $20,376 $10,943
52,361
kWh
- - - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,940 $114,566 $32,940
157,606
kWh
- - - - -
09 3.4151: Minimize water usage $3,105 $23,556 - - - $619
-
Tgal
$2,486
-
Tgal
-
10 2.2622: Replace existing chiller with high efficiency model $8,335 $80,990 $8,335
39,885
kWh
- - - - -
11 2.9114: Use solar heat to make electricty $223,918 $872,791 $223,918
1,071,379
kWh
- - - - -
TOTAL RECOMMENDED $362,533 $1,135,849 $348,857
1,669,198
kWh
$7,098
-
kW-mo/yr
$5,773
-
MMBtu
$619
-
Tgal
$2,486
-
Tgal
$(-2,300.0)
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs