ITAC Assessment: AS0292
ITAC logo
ITAC Assessment: AS0292
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aluminum Extruded Products for Aircraft Applications
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 124
Plant Area 35,000
ft2
Annual Production 21,000,000
lb
Production Hrs. Annual 5,400
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $480,870 16,029,000
kWh
Electricity Demand $357,966 55,072
kW-mo/yr
Electricity Fees $54,608 -
Natural Gas $221,652 66,407
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $184,726 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,245

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings By-product Production Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,245 $540 $1,009
31,546
kWh
$1,236
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,097 $60 $807
25,230
kWh
$290
-
kW-mo/yr
- -
03 2.7261: Install timers and/or thermostats $1,246 $1,575 $1,246
36,223
kWh
- - -
04 2.4133: Use most efficient type of electric motors $3,681 $12,153 $2,706
84,559
kWh
$975
-
kW-mo/yr
- -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $2,330 $60 - - - $2,330
06 3.6192: Use a less expensive method of waste removal $2,727 $60 - - - $2,727
07 4.431: Train operators for maximum operating efficiency $156,400 $11,520 - - $156,400 -
08 4.232: Lease equipment instead of purchasing $15,000 $1,200 - - $15,000 -
TOTAL RECOMMENDED $184,726 $27,168 $5,768
177,558
kWh
$2,501
-
kW-mo/yr
$171,400 $5,057
TOTAL IMPLEMENTED $2,245 $540 $1,009
31,546
kWh
$1,236
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs