ITAC Assessment: SF0618
ITAC logo
ITAC Assessment: SF0618
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Treated Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 51
Plant Area 620,000
ft2
Annual Production 7,957,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,830,561 16,518,812
kWh
Electricity Demand $1,278,621 33,595
kW-mo/yr
Natural Gas $705,509 36,712
MMBtu
TOTAL YEARLY COSTS $3,814,691
RECOMMENDED SAVINGS* $813,726 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,570 $175 $1,748
15,763
kWh
$822
-
kW-mo/yr
- - -
02 2.6212: Turn off equipment during breaks, reduce operating time $4,735 $1,500 $4,735
42,734
kWh
- - - -
03 2.1336: Install equipment to utilize waste fuel $705,605 $250,000 - - $705,605
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,266 $3,170 $1,767
15,943
kWh
$822
-
kW-mo/yr
- $583 $94
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,359 $2,340 $2,359
21,287
kWh
- - - -
06 2.5194: Redesign process $59,966 $75,700 $59,966
541,208
kWh
- - - -
07 2.4322: Use or replace with energy efficient substitutes $9,674 $19,158 $9,674
87,312
kWh
- - - -
08 2.4226: Use / purchase optimum sized compressor $22,115 $60,335 $22,115
199,592
kWh
- - - -
09 2.7134: Use photocell controls $2,561 $10,136 $1,413
12,755
kWh
- - $706 $442
10 2.7224: Reduce space conditioning during non-working hours $875 $3,607 $875
7,900
kWh
- - - -
TOTAL RECOMMENDED $813,726 $426,121 $104,652
944,494
kWh
$1,644
-
kW-mo/yr
$705,605
-
MMBtu
$1,289 $536
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs