Assessment Year | 2024 |
---|---|
Principal Product | Treated Water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $1 M to 5M |
# of Employees | 51 |
Plant Area |
620,000
ft2
|
Annual Production | 7,957,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,830,561 | 16,518,812 |
kWh
|
$0.11 |
Electricity Demand | $1,278,621 | 33,595 |
kW-mo/yr
|
$38.06 |
Natural Gas | $705,509 | 36,712 |
MMBtu
|
$19.22 |
TOTAL YEARLY COSTS | $3,814,691 | |||
RECOMMENDED SAVINGS* | $813,726 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,570 | $175 |
$1,748
15,763
kWh
|
$822
-
kW-mo/yr
|
- | - | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $4,735 | $1,500 |
$4,735
42,734
kWh
|
- | - | - | - | |
03 | 2.1336: Install equipment to utilize waste fuel | $705,605 | $250,000 | - | - |
$705,605
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,266 | $3,170 |
$1,767
15,943
kWh
|
$822
-
kW-mo/yr
|
- | $583 | $94 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,359 | $2,340 |
$2,359
21,287
kWh
|
- | - | - | - | |
06 | 2.5194: Redesign process | $59,966 | $75,700 |
$59,966
541,208
kWh
|
- | - | - | - | |
07 | 2.4322: Use or replace with energy efficient substitutes | $9,674 | $19,158 |
$9,674
87,312
kWh
|
- | - | - | - | |
08 | 2.4226: Use / purchase optimum sized compressor | $22,115 | $60,335 |
$22,115
199,592
kWh
|
- | - | - | - | |
09 | 2.7134: Use photocell controls | $2,561 | $10,136 |
$1,413
12,755
kWh
|
- | - | $706 | $442 | |
10 | 2.7224: Reduce space conditioning during non-working hours | $875 | $3,607 |
$875
7,900
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $813,726 | $426,121 |
$104,652
944,494
kWh
|
$1,644
-
kW-mo/yr
|
$705,605
-
MMBtu
|
$1,289 | $536 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs