Assessment Year | 2023 |
---|---|
Principal Product | Red wine, white wine, sparkling wine base |
NAICS | 312130: Wineries |
SIC | 2084: Wines, Brandy, and Brandy Spirits |
Sales Range | $50 M to 100M |
# of Employees | 56 |
Plant Area |
350,000
ft2
|
Annual Production | 2,960
Tgal
|
Production Hrs. Annual | 2,784
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $412,034 | 1,422,792 |
kWh
|
$0.29 |
Natural Gas | $240,385 | 13,878 |
MMBtu
|
$17.32 |
TOTAL YEARLY COSTS | $652,419 | |||
RECOMMENDED SAVINGS* | $554,106 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $116,084 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $12,048 | $1,594 |
$12,048
41,660
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,389 | $1,640 |
$14,229
49,135
kWh
|
- | - | $(-3,840.0) | |
03 | 2.2515: Use optimum thickness insulation | $1,473 | $338 | - | - |
$1,473
-
MMBtu
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,090 | $2,155 |
$3,090
10,672
kWh
|
- | - | - | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $32,617 | $36,367 |
$32,617
112,628
kWh
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $56,467 | $66,447 |
$56,467
194,894
kWh
|
- | - | - | |
07 | 2.2515: Use optimum thickness insulation | $8,652 | $21,442 |
$8,652
29,876
kWh
|
- | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,153 | $9,827 |
$3,153
10,888
kWh
|
- | - | - | |
09 | 2.9121: Install wind powered electric generator | $426,217 | $1,338,900 |
$474,069
1,636,980
kWh
|
$(-40,000.0) | - | $(-7,852.0) | |
TOTAL RECOMMENDED | $554,106 | $1,478,710 |
$604,325
2,086,733
kWh
|
$(-40,000.0) |
$1,473
-
MMBtu
|
$(-11,692.0) | ||
TOTAL IMPLEMENTED | $116,084 | $108,541 |
$118,451
408,989
kWh
|
- |
$1,473
-
MMBtu
|
$(-3,840.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs