ITAC Assessment: SF0594
ITAC logo
ITAC Assessment: SF0594
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Chili, Garlic and Onion Powder
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 500,000
ft2
Annual Production 12,500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $844,553 7,071,893
kWh
Electricity Demand $185,985 15,816
kW-mo/yr
Natural Gas $78,410 6,170
MMBtu
TOTAL YEARLY COSTS $1,108,948
RECOMMENDED SAVINGS* $145,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,580 - - $10,580
-
kW-mo/yr
- - -
02 2.6212: Turn off equipment during breaks, reduce operating time $10,143 - $10,143
84,946
kWh
- - - -
03 2.7224: Reduce space conditioning during non-working hours $38,807 $8,920 $12,759
106,862
kWh
- $26,048
-
MMBtu
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $54,583 $28,593 $45,898
384,410
kWh
$8,685
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $7,223 $4,344 $5,955
49,875
kWh
$1,268
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $18,717 $13,055 $14,381
120,447
kWh
$4,086
-
kW-mo/yr
- $393 $(-143.0)
07 2.2437: Recover waste heat from equipment $5,385 $9,100 - - $5,385
-
MMBtu
- -
08 2.2511: Insulate bare equipment $559 $1,938 - - $559
-
MMBtu
- -
TOTAL RECOMMENDED $145,997 $65,950 $89,136
746,540
kWh
$24,619
-
kW-mo/yr
$31,992
-
MMBtu
$393 $(-143.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs