ITAC Assessment: MS0110
ITAC logo
ITAC Assessment: MS0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product injection molded plastic parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area 22,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,487 1,033,705
kWh
Electricity Demand $10,811 2,765
kW-mo/yr
Electricity Fees $12,541 -
Natural Gas $1,550 248
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,391 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,526

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $3,125 - - $2,101
-
kW-mo/yr
$1,024 - - - -
02 2.4221: Install compressor air intakes in coolest locations $562 $99 $280
5,862
kWh
$21
-
kW-mo/yr
$261 - - - -
03 2.4314: Use synthetic lubricant $641 $94 $315
8,206
kWh
$29
-
kW-mo/yr
$297 - - - -
04 2.7134: Use photocell controls $357 $116 $188
3,810
kWh
- $169 - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,881 $3,488 $1,907
39,859
kWh
$179
-
kW-mo/yr
$1,795 - - - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $9,366 $6,500 - - - $4,866
-
lb
- - $4,500
07 4.515: Install shelves / racks to utilize unused space $13,832 $1,662 - - - - - $13,832 -
08 4.423: Move product using mechanical means $29,627 $13,923 $(-196.0)
(-4,103)
kWh
$(-166.0)
-
kW-mo/yr
$(-251.0) - $30,240 - -
TOTAL RECOMMENDED $61,391 $25,882 $2,494
53,634
kWh
$2,164
-
kW-mo/yr
$3,295 $4,866
-
lb
$30,240 $13,832 $4,500
TOTAL IMPLEMENTED $27,526 $8,355 $595
14,068
kWh
$2,151
-
kW-mo/yr
$1,582 $4,866
-
lb
- $13,832 $4,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs