ITAC Assessment: SF0589
ITAC logo
ITAC Assessment: SF0589
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Waste water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 770,000
ft2
Annual Production 421,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,552 1,335,718
kWh
Electricity Demand $90,955 2,388
kW-mo/yr
Electricity Fees $309,091 -
TOTAL YEARLY COSTS $615,598
RECOMMENDED SAVINGS* $242,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,699

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $14,854 - $14,854
92,033
kWh
- - -
02 2.4322: Use or replace with energy efficient substitutes $53,458 $172,352 $40,398
250,397
kWh
$13,060
-
kW-mo/yr
- -
03 2.6231: Utilize controls to operate equipment only when needed $20,922 $73,113 $20,922
129,629
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,794 $15,591 $3,794
23,505
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,635 $18,061 $2,721
16,858
kWh
$914
-
kW-mo/yr
- -
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $95,881 $341,026 $122,707
760,266
kWh
$39,800
-
kW-mo/yr
$(-52,713.0)
-
MMBtu
$(-13,913.0)
07 2.9114: Use solar heat to make electricty $50,416 $292,043 $50,416
312,365
kWh
- - -
TOTAL RECOMMENDED $242,960 $912,186 $255,812
1,585,053
kWh
$53,774
-
kW-mo/yr
$(-52,713.0)
-
MMBtu
$(-13,913.0)
TOTAL IMPLEMENTED $72,699 $325,695 $71,785
444,761
kWh
$914
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs