ITAC Assessment: SF0586
ITAC logo
ITAC Assessment: SF0586
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Wire and Cable
NAICS 335929: Other Communication and Energy Wire Manufacturing
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 136,000
ft2
Annual Production 21,000
thousand feet
Production Hrs. Annual 7,344
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $828,478 9,327,830
kWh
Electricity Demand $391,152 17,316
kW-mo/yr
Electricity Fees $17,966 -
Natural Gas $147,294 9,712
MMBtu
TOTAL YEARLY COSTS $1,384,890
RECOMMENDED SAVINGS* $192,977 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $192,977

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $1,887 - $1,887
21,325
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,868 - $11,948
134,544
kWh
- $(-1,080.0) -
03 2.6231: Utilize controls to operate equipment only when needed $38,078 $22,361 $38,078
428,802
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $38,428 $26,487 $24,142
271,863
kWh
$13,488
-
kW-mo/yr
$869 $(-71.0)
05 2.6231: Utilize controls to operate equipment only when needed $35,916 $68,135 $35,916
404,465
kWh
- - -
06 2.2511: Insulate bare equipment $1,974 $4,260 $1,974
22,228
kWh
- - -
07 2.4239: Eliminate or reduce compressed air usage $3,736 $14,830 $3,736
42,077
kWh
- - -
08 2.3311: Replace dc equipment with ac equipment $62,090 $317,631 $43,874
494,080
kWh
$18,216
-
kW-mo/yr
- -
TOTAL RECOMMENDED $192,977 $453,704 $161,555
1,819,384
kWh
$31,704
-
kW-mo/yr
$(-211.0) $(-71.0)
TOTAL IMPLEMENTED $192,977 $453,704 $161,555
1,819,384
kWh
$31,704
-
kW-mo/yr
$(-211.0) $(-71.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs