Assessment Year | 2022 |
---|---|
Principal Product | Plastic products for scientific and medical laboratories |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
110,000
ft2
|
Annual Production | 1,500,000,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,076,035 | 10,867,035 |
kWh
|
$0.099 | |
Electricity Demand | $161,000 | 18,288 |
kW-mo/yr
|
$8.80 | |
Electricity Fees | $12,621 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $12,242 | 8,163 |
Tgal
|
$1.50 | |
Water Disposal | $5,741 | 8,163 |
Tgal
|
$0.70 | |
TOTAL YEARLY COSTS | $1,267,639 | ||||
RECOMMENDED SAVINGS* | $46,401 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $27,175 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,948 | $240 |
$4,411
44,554
kWh
|
$537
-
kW-mo/yr
|
- | - | |
02 | 2.7224: Reduce space conditioning during non-working hours | $10,046 | $2,379 |
$10,046
101,473
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,018 | $13,272 |
$12,577
127,036
kWh
|
$2,053
-
kW-mo/yr
|
$720 | $(-1,332.0) | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $5,208 | $6,293 |
$5,208
52,616
kWh
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,181 | $30,438 |
$12,181
123,039
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $46,401 | $52,622 |
$44,423
448,718
kWh
|
$2,590
-
kW-mo/yr
|
$720 | $(-1,332.0) | ||
TOTAL IMPLEMENTED | $27,175 | $33,057 |
$26,638
269,066
kWh
|
$537
-
kW-mo/yr
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs