ITAC Assessment: SF0583
ITAC logo
ITAC Assessment: SF0583
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Plastic products for scientific and medical laboratories
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 110,000
ft2
Annual Production 1,500,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,076,035 10,867,035
kWh
Electricity Demand $161,000 18,288
kW-mo/yr
Electricity Fees $12,621 -
Waste Disposal Costs
Water Usage $12,242 8,163
Tgal
Water Disposal $5,741 8,163
Tgal
TOTAL YEARLY COSTS $1,267,639
RECOMMENDED SAVINGS* $46,401 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,948 $240 $4,411
44,554
kWh
$537
-
kW-mo/yr
- -
02 2.7224: Reduce space conditioning during non-working hours $10,046 $2,379 $10,046
101,473
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,018 $13,272 $12,577
127,036
kWh
$2,053
-
kW-mo/yr
$720 $(-1,332.0)
04 2.6231: Utilize controls to operate equipment only when needed $5,208 $6,293 $5,208
52,616
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,181 $30,438 $12,181
123,039
kWh
- - -
TOTAL RECOMMENDED $46,401 $52,622 $44,423
448,718
kWh
$2,590
-
kW-mo/yr
$720 $(-1,332.0)
TOTAL IMPLEMENTED $27,175 $33,057 $26,638
269,066
kWh
$537
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs