ITAC Assessment: SF0579
ITAC logo
ITAC Assessment: SF0579
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Metal Cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 87
Plant Area 145,000
ft2
Annual Production 275,000,000
units
Production Hrs. Annual 5,280
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $320,696 3,629,648
kWh
Electricity Demand $135,760 8,292
kW-mo/yr
Natural Gas $67,177 10,219
MMBtu
Waste Disposal Costs
Water Usage $3,300 1,251
Tgal
Water Disposal $5,992 1,251
Tgal
TOTAL YEARLY COSTS $532,925
RECOMMENDED SAVINGS* $94,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,981

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $3,573 $100 $2,510
28,556
kWh
$1,063
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $8,525 - $9,325
106,095
kWh
- - $(-800.0) -
03 2.6218: Turn off equipment when not in use $37,544 - $37,544
427,172
kWh
- - - -
04 2.7224: Reduce space conditioning during non-working hours $2,201 $1,018 $1,305
14,852
kWh
- $896
-
MMBtu
- -
05 2.4239: Eliminate or reduce compressed air usage $13,523 $11,498 $13,523
153,857
kWh
- - - -
06 2.4239: Eliminate or reduce compressed air usage $6,583 $6,929 $6,583
74,902
kWh
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,775 $8,827 $6,775
77,087
kWh
- - - -
08 2.6231: Utilize controls to operate equipment only when needed $1,024 $2,236 $1,024
11,648
kWh
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $10,144 $23,308 $7,198
81,895
kWh
$3,164
-
kW-mo/yr
- - $(-218.0)
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,437 $13,019 $3,033
34,506
kWh
$1,404
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $94,329 $66,935 $88,820
1,010,570
kWh
$5,631
-
kW-mo/yr
$896
-
MMBtu
$(-800.0) $(-218.0)
TOTAL IMPLEMENTED $83,981 $58,008 $79,535
904,927
kWh
$4,568
-
kW-mo/yr
$896
-
MMBtu
$(-800.0) $(-218.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs