ITAC Assessment: SF0577
ITAC logo
ITAC Assessment: SF0577
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Metal Containers
NAICS 332439: Other Metal Container Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 270,000
ft2
Annual Production 2,400
units
Production Hrs. Annual 2,525
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,270 399,236
kWh
Electricity Demand $15,185 1,154
kW-mo/yr
Electricity Fees $8,724 -
Natural Gas $812 48
MMBtu
LPG $11,811 475
MMBtu
Waste Disposal Costs
Water Usage $7,023 2,315
Tgal
Water Disposal $6,356 2,118
Tgal
Other Liquid (non-haz) $2,323 207,015
gal
TOTAL YEARLY COSTS $138,504
RECOMMENDED SAVINGS* $96,257 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,257

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,483 - $4,100
18,359
kWh
$1,133
-
kW-mo/yr
$(-1,750.0) -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $141 $62 $124
504
kWh
$17
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,636 $26,920 $7,340
32,870
kWh
$3,150
-
kW-mo/yr
$338 $(-192.0)
04 2.4224: Upgrade controls on compressors $4,632 $30,160 $3,629
16,252
kWh
$1,003
-
kW-mo/yr
- -
05 2.9114: Use solar heat to make electricty $77,365 $283,655 $77,365
346,458
kWh
- - -
TOTAL RECOMMENDED $96,257 $340,797 $92,558
414,443
kWh
$5,303
-
kW-mo/yr
$(-1,412.0) $(-192.0)
TOTAL IMPLEMENTED $96,257 $340,797 $92,558
414,443
kWh
$5,303
-
kW-mo/yr
$(-1,412.0) $(-192.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs