ITAC Assessment: SF0574
ITAC logo
ITAC Assessment: SF0574
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Tungsten parts
NAICS 334419: Other Electronic Component Manufacturing
SIC 3671: Electron Tubes
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 25,600
ft2
Annual Production 8,500
units
Production Hrs. Annual 2,625
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,224 604,985
kWh
Electricity Demand $31,638 2,924
kW-mo/yr
Electricity Fees $12,048 -
Other Gas $8,086 101
MMBtu
Waste Disposal Costs
Water Usage $2,560 102
Tgal
TOTAL YEARLY COSTS $177,556
RECOMMENDED SAVINGS* $147,398 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $143,218

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Ancillary Material Cost Savings
01 2.7261: Install timers and/or thermostats $6,067 $5,306 $6,067
29,785
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,180 $4,064 $4,180
20,519
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $20,332 $38,413 $20,332
80,150
kWh
-
04 2.9114: Use solar heat to make electricty $96,904 $419,477 $96,904
475,714
kWh
-
05 2.8212: Reduce delivery schedules $19,915 $56,589 - $19,915
TOTAL RECOMMENDED $147,398 $523,849 $127,483
606,168
kWh
$19,915
TOTAL IMPLEMENTED $143,218 $519,785 $123,303
585,649
kWh
$19,915
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs