Assessment Year | 2021 |
---|---|
Principal Product | Still Wines |
NAICS | 312130: Wineries |
SIC | 2084: Wines, Brandy, and Brandy Spirits |
Sales Range | $1 M to 5M |
# of Employees | 16 |
Plant Area |
67,500
ft2
|
Annual Production | 67
Tgal
|
Production Hrs. Annual | 3,200
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $153,292 | 978,433 |
kWh
|
$0.16 |
Electricity Demand | $24,220 | 2,151 |
kW-mo/yr
|
$11.26 |
Electricity Fees | $32,933 | - |
|
- |
LPG | $34,503 | 2,631 |
MMBtu
|
$13.11 |
TOTAL YEARLY COSTS | $244,948 | |||
RECOMMENDED SAVINGS* | $277,371 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $277,371 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|
01 | 2.2625: Chill water to the highest temperature possible | $5,931 | - |
$5,931
35,285
kWh
|
- | - | |
02 | 2.7261: Install timers and/or thermostats | $4,698 | $3,740 |
$4,698
27,945
kWh
|
- | - | |
03 | 2.2691: Shut off cooling if cold outside air will cool process | $5,693 | $9,138 |
$5,693
33,866
kWh
|
- | - | |
04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $7,674 | $23,650 |
$7,674
45,651
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $2,279 | $6,956 |
$2,279
13,559
kWh
|
- | - | |
06 | 2.9114: Use solar heat to make electricty | $107,546 | $722,227 |
$104,851
832,207
kWh
|
$2,695
-
kW-mo/yr
|
- | |
07 | 3.1191: Change procedures / equipment / operating conditions | $143,550 | $77,720 | - | - | $143,550 | |
TOTAL RECOMMENDED | $277,371 | $843,431 |
$131,126
988,513
kWh
|
$2,695
-
kW-mo/yr
|
$143,550 | ||
TOTAL IMPLEMENTED | $277,371 | $843,431 |
$131,126
988,513
kWh
|
$2,695
-
kW-mo/yr
|
$143,550 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs