| Assessment Year | 1993 |
|---|---|
| Principal Product | cheese products |
| NAICS |
n/a
|
| SIC | 2023: Dry, Condensed, and Evaporated Dairy Products |
| Sales Range | $100 M to 500M |
| # of Employees | 325 |
| Plant Area |
110,000
ft2
|
| Annual Production | 96,500,000
lb
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $483,220 | 7,064,478 |
kWh
|
$0.068 |
| Natural Gas | $93,190 | 34,696 |
MMBtu
|
$2.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $119,703 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,391 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,306 | $1,000 | - |
$1,306
-
MMBtu
|
|
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $416 | $1,200 | - |
$416
-
MMBtu
|
|
| 03 | 2.4133: Use most efficient type of electric motors | $2,091 | $4,600 |
$2,091
30,481
kWh
|
- | |
| 04 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $88,602 | $95,000 | - |
$88,602
-
MMBtu
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $13,994 | $250 |
$13,994
204,572
kWh
|
- | |
| 06 | 2.7135: Install occupancy sensors | $4,847 | $1,899 |
$4,847
70,926
kWh
|
- | |
| 07 | 2.2428: Use flue gases in radiant heater for space heating, ovens, etc | $7,910 | $30,000 | - |
$7,910
-
MMBtu
|
|
| 08 | 2.1213: Direct warmest air to combustion intake | $537 | $1,100 | - |
$537
-
MMBtu
|
|
| TOTAL RECOMMENDED | $119,703 | $135,049 |
$20,932
305,979
kWh
|
$98,771
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $17,391 | $5,850 |
$16,085
235,053
kWh
|
$1,306
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs